LEARC Led Lighting top quality 12 Volt 2 Amp LED Driver for LED strip BD-12-2
LEARC aluminium die cast / mild steel powder coated white finish double spot light bar 9.4 inch with 3 watt adjustible spots ML382-2










| ORDER VALUE | DISCOUNT | COUPON CODE |
|---|---|---|
| Rs 10,000/- TO Rs 49,999/- | 5% | TLK5 |
| Rs 50,000/- TO Rs 74,999/- | 7.5% | TLK7.5 |
| Rs75,000/- TO Rs 99,999/- | 10% | TLK10 |
| Above Rs 1,00,000/- | 12% | TLK12/REQUEST QUOTE |
NOTE: Above schemes are available on a purchase of single order only. In case of multiple order within a time frame of 30 days, cashback will be remitted to your account.Â
₹1,070 Original price was: ₹1,070.₹535Current price is: ₹535. Inc. GST
![]()

200 in stock
Highly durable LED strip driver successfully tested for extreme voltage variations with high success rate of 99.5%.Suitable for 5050/ 5 meter LED roll with 60 LED per meter.
| Weight | 1.5 kg |
|---|---|
| Warranty | 2 Years |
| Length (mm) | 50 |
| Width(mm) | 160 |
| Height (mm) | 40 |
| Transformer Details | Power – 60W, Output Voltage – 12V, Output current – 5A |
| Product Weight(kg) | 0.18 |
Our order processing team processes all the orders once daily at 8:00 am in the morning. So, all orders booked after 8:00 am in the morning will be processed the next working day at 8 am and so on. Once we have your order our processing team will start processing your order dispatch them within three working after your processing has started. Once dispatched the tracking details will be available on our website. We usually dispatch by the top most courier services by surface mode available for that pin code. In general courier's take maximum of 7 to 10 days even to the remote locations.
| Regions | Transit Time |
|---|---|
EXCLUDING ORDER HANDLING AND PROCESSING TIME (3 WORKING DAYS) |
|
| Haryana, Delhi, Punjab, Uttar Pradesh, Himachal Pradesh, Chandigarh, Uttarakhand, Jammu & Kashmir, Rajasthan | 4-10 Days |
| Sikkim, Assam, Meghalaya, Arunachal Pradesh, Mizoram, Tripura, Nagaland | 4-10 Days |
| Goa, Dadra & Nagar Haveli, Gujarat, Maharashtra, Daman & Diu | 4-10 Days |
| Madhya Pradesh, Chattisgarh, Jharkhand | 4-10 Days |
| West Bengal, Odisha, Bihar | 4-10 Days |
| Andaman & Nicobar Islands | 7-10 Days |
| Lakshadweep | 7-10 Days |
| Manipur | 7-10 Days |
Sending...

Reviews
There are no reviews yet