Back
Previous product
GARNET WAVE SPOT LIGHT DG51227 12 WATT WARM WHITE YELLOW WP1274 Original price was: ₹890.Current price is: ₹449. Inc. GST
Next product
WIPRO GARNET IP65 50 METER LED STRIP LIGHT DF52865 FOR OUTDOOR USE COOL DAY LIGHT WHITE 6500K WP1276 Original price was: ₹13,990.Current price is: ₹6,135. Inc. GST
-52%
‎Wipro

WIPRO GARNET 25W LED STRIP 5 METER, D42880-1, WITH 2A DRIVER H43520 BLUE WP1275

Original price was: ₹1,550.Current price is: ₹744. Inc. GST

“We are authorised  dealer of Wipro Lighting, genuine products guaranteed.”

Usually delivered within 7 to 10 days all over India.

Scroll down to see family products ,Product details & Discounts.

100 in stock

SKU: WP1275 Categories: , Tag:

Description

Description

25W LED Strip Light and 2 Amp Drive.
1 Years warranty on the product from date of invoice.
3M Tape: Original 3M tape for better stickiness.
Efficacy: Industry best light output upto 100 Lm/W.
Copper Thickness: 2 ounce PCB to ensure good heat dissipation.
PCB Design: Double layer copper for efficient flow of current.

Additional information

Additional information

Weight 0.75 kg
SKU

WP1275

Brand

‎Wipro

Warranty

2 Years

Construction

PCB With Double Copper Layer

Colour Finish

Black

Length(mm)

5000

Number of Lamps

60/METER

Lamp Type

COB

Total Wattage (W)

25W

Color Temperature

BLUE

Part Number

D42880-1, H43520

Shipping & Delivery

Our order processing team processes all the orders once daily at 8:00 am in the morning. So, all orders booked after 8:00 am in the morning will be processed the next working day at 8 am and so on. Once we have your order our processing team will start processing your order dispatch them within three working after your processing has started. Once dispatched the tracking details will be available on our website. We usually dispatch by the top most courier services by surface mode available for that pin code. In general courier's take maximum of 7 to 10 days even to the remote locations.

Regions Transit Time

EXCLUDING ORDER HANDLING AND PROCESSING TIME (3 WORKING DAYS)

Haryana, Delhi, Punjab, Uttar Pradesh, Himachal Pradesh, Chandigarh, Uttarakhand, Jammu & Kashmir, Rajasthan 4-10 Days
Sikkim, Assam, Meghalaya, Arunachal Pradesh, Mizoram, Tripura, Nagaland 4-10 Days
Goa, Dadra & Nagar Haveli, Gujarat, Maharashtra, Daman & Diu 4-10 Days
Madhya Pradesh, Chattisgarh, Jharkhand 4-10 Days
West Bengal, Odisha, Bihar 4-10 Days
Andaman & Nicobar Islands 7-10 Days
Lakshadweep 7-10 Days
Manipur 7-10 Days