-41%
‎Wipro

Wipro Garnet 9-Watt LED Slim Cob Light, D320965,Cool Day Light, White, Round WP1059

707 Inc. GST

“We are authorised  dealer of Wipro Lighting, genuine products guaranteed.”

Usually delivered within 7 to 10 days all over India.

Scroll down to see family products ,Product details & Discounts.

198 in stock

SKU: WP1059 Categories: , Tag:

Description

Description

New generation COB LED technology, with innovative adjustable optics that focus light on desired areas. It’s great colour and light quality adds value to your products/merchandise by enhancing their looks and appeal. Features that makes the Wipro Garnet 3W Slim COB Spotlight the best in class lighting solution.
1. Slimmest spotlights (20mm), easily used in low depth false ceiling.
2.Aluminum PDC heat sink for effective heat dissipation.
3. Dual optics technology for better light distribution. 4. Adjustable design to focus light on desired area.
5. LM 80 tested LED technology.
6.High volatge protection upto 380VAC.
7.Surge protection upto 2.5KV.

Additional information

Additional information

Weight 0.4 kg
SKU

WP1059

Brand

‎Wipro

Warranty

1 Year

Construction

Aluminium Die Cast

Colour Finish

White

Length(mm)

87

Width(mm)

87

Height(mm)

20

Lamp Type

COB LED

Total Wattage (W)

9W

Cut Out (mm)

77

Color Temperature

6500K

Lumens

720 Lumens

Beam Angle

38 degree

Part Number

D320965

Shipping & Delivery

Our order processing team processes all the orders once daily at 8:00 am in the morning. So, all orders booked after 8:00 am in the morning will be processed the next working day at 8 am and so on. Once we have your order our processing team will start processing your order dispatch them within three working after your processing has started. Once dispatched the tracking details will be available on our website. We usually dispatch by the top most courier services by surface mode available for that pin code. In general courier's take maximum of 7 to 10 days even to the remote locations.

Regions Transit Time

EXCLUDING ORDER HANDLING AND PROCESSING TIME (3 WORKING DAYS)

Haryana, Delhi, Punjab, Uttar Pradesh, Himachal Pradesh, Chandigarh, Uttarakhand, Jammu & Kashmir, Rajasthan 4-10 Days
Sikkim, Assam, Meghalaya, Arunachal Pradesh, Mizoram, Tripura, Nagaland 4-10 Days
Goa, Dadra & Nagar Haveli, Gujarat, Maharashtra, Daman & Diu 4-10 Days
Madhya Pradesh, Chattisgarh, Jharkhand 4-10 Days
West Bengal, Odisha, Bihar 4-10 Days
Andaman & Nicobar Islands 7-10 Days
Lakshadweep 7-10 Days
Manipur 7-10 Days